Stamp: Integration into European Union Electricity Grid (Lithuania 2025)

Integration into European Union Electricity Grid (Lithuania 2025)

07 March (Lithuania ) within release Lithuania-Estonia-Latvia Joint Issue : Electricity (2025) goes into circulation Stamp Integration into European Union Electricity Grid face value 2.10 Euro

Stamp Integration into European Union Electricity Grid in catalogues
Colnect codes: Col: LT 2025.03.07-01

Stamp is square format.

Data entry completed
53%
Stamp Integration into European Union Electricity Grid in digits
Country: Lithuania
Date: 2025-03-07
Print: Offset lithography
Emission: Commemorative
Format: Stamp
Face Value: 2.10 Euro
Print run: 15000

Stamp Integration into European Union Electricity Grid it reflects the thematic directions:

Electricity is the set of physical phenomena associated with the presence and motion of matter possessing an electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwell's equations. Common phenomena are related to electricity, including lightning, static electricity, electric heating, electric discharges and many others.

The European Union (EU) is a supranational political and economic union of 27 member states that are located primarily in Europe.The Union has a total area of 4,233,255 km2 (1,634,469 sq mi) and an estimated total population of over 448 million. The EU has often been described as a sui generis political entity (without precedent or comparison) combining the characteristics of both a federation and a confederation

A joint issue is the release of stamps or postal stationery by two or more countries to commemorate the same topic, event or person. Joint issues typically have the same first day of issue and their design is often similar or identical, except for the identification of country and value.
Stamp, Integration into European Union Electricity Grid, Lithuania,  , Electricity, European Union, Joint Issues